Monday 2 March 2020

Additional housing units in Anushaktinagar.

AU/16/DCSEM/20/21                02/03/2020

To,
The Director
DCSEM

Ref: 1. 75th DAE DC meeting Minutes Para 2.11. Staff side submission.
2. JCM/SS/PP/2019/09 (addressed to JS A&A)
Sub: Additional housing units in Anushaktinagar.


Sir,
    With reference to the above subject the staff side would like to submit the following points for your consideration.
•    Staff side was demanded additional housing units construction at Mumbai/Anushaktinagar.
•    It was further requested to redevelopment of few buildings of Category 1-A (Ramdas, Tukaram, Tulsidas) which are substandard with respect to facilities.
•    These buildings (166 flats) are very old and having irreparable seepage.
•    The satisfaction level of categorized flats 2-B is 12 years as per the previous allotment year.
•    We have approximately 360 flats in 1-A category other than the above mentioned 166.
•    There is no appointments in Group D and the demand in 1-A is limited compare to 2-B.
•    We have already constructed 200 (160 SA and 40 medical) 1-A transit accommodation.
•    The transit occupancies are likely to move to 2-B were there is more stagnation persist.
•    Tulsidas chawk which consist of 38 flats can be taken up for redevelopment as first tower 2-B as first phase.



In the past it is proved that construction of categorized flats are more essential than the transit accommodation. Delay in completing type D and C flats made more waiting period in the service seniority categories.
In the above stated position staff side would like to request you to initiate the first phase process of redevelopment and constructing type B flats without waiting for another three years.

Thanking you

Yours faithfully


A Sreedharan
(Gen. Secretary)

CC to: Under Secretary,
IR&W, DAE.